City of San Diego guide Checked August 2026

SAN DIEGO ADU PERMITS

How does the San Diego ADU permit process work?

It starts before you submit plans and ends after the final inspection.

Illustration: a permit-style document showing a house and a review cycle arrow

THE SHORT ANSWER

Six stages take the project from idea to final.

First confirm the property and the project. Then prepare the plans, answer City comments, build what was approved, and finish the inspections and records.

Check my property

THE PERMIT PATH

What happens, and when?

Illustrated permit path from confirming the property through plans, revisions, construction, inspection, and final approval
01

Confirm the path

Property, legal units, project type, and size.

02

Answer big questions

Resolve the unknowns that could change the plan.

03

Prepare the plans

Coordinate the drawings and supporting documents.

04

Submit, revise, permit issued

Track comments, responses, and updated sheets until the City issues the permit. Construction starts after that, not before.

05

Build and inspect

Keep the field work aligned with the approved scope.

06

Finish and close out

Complete final approval, records, warranties, and project files.

How long will it take?

The plan, corrections, special reviews, and City workload can all change the timeline. Use current City estimates as a planning range.

COMMON QUESTIONS

What homeowners ask next.

Can I submit drawings I made myself?

Drawings must clearly and correctly show the required work. The appropriate preparer and any professional stamps depend on the scope and the responsibilities involved.

What if an inspector interprets part of the work differently?

Keep the approved drawings, applicable detail, and field condition together. Route material changes or conflicts through the responsible professionals and City process rather than relying on an undocumented conversation.

Do small changes require new plans?

Some field issues can be handled through the inspection or change process; others require revised documents and approval. Ask before building the changed work.

When should I pay a contractor deposit?

Only after you have reviewed the project scope, the contractor's identity and active license, the contract, the payment schedule, the insurance, and the legal requirements that apply.